Galloway provided complete project services on behalf of the Town of Johnstown for roadway improvements to WCR 50. These services included site survey, civil documents and reports, preliminary and final design, and as-needed construction contract administration.
Preliminary design included coordinating with the Town staff, with adjacent property owners, and with utility and irrigation companies as needed; conducting field investigations that included establishing the survey control for the project; identifying the existing utilities, existing storm sewer crossings, and drainage patterns; completing a soils testing program; and designing the roadway improvements and intersections within the project corridor as well as applicable drainage crossings for the associated improvements. The preliminary roadway design was submitted to the Town for review along with detailed opinions of probable construction costs.
For the final design, Galloway developed review plans that were submitted to the Town for comments. The final construction documents were accompanied by a detailed opinion of probable construction costs with the final design review plans and an advertisement set. Galloway developed construction specifications that coincide with the plans and followed the Johnstown Public Improvement Design Standards and Specifications. Galloway also assisted the Town with the advertisement and pre-bid meeting for the project. Consultation services will be provided on an as-needed basis during construction.